Installer
Planning
Installer start-up guide (read first)
Global planning of a Climkit site
Process for setting up a Climkit site
Plan the connection of the Climkit Gateway and network connectivity
Schedule electricity management
Plan optimization and energy storage
Plan the management of electric vehicle charging stations
Plan the management of room heating, water and ancillary costs
Schedule collective laundry management
Schedule eBike charging management
General terms and conditions of sale
Platform configuration
Request for an Installer account
Creation of a new site
Add the router (4G or LAN)
Adding the Climkit Gateway
Adding electricity meters
Save the photovoltaic installation information
Save battery information
Adding charging stations
Add the OCPP Remote electric vehicle charging station
Add the 4-relay I/O module
Add RFID readers
Adding heat and water meters
Installation and connection
Install the 4G Router
Install the LAN router
Install the Climkit Gateway
Install the RS485-Ethernet converter
Install the M-Bus converter
Install the standard Ethernet switch
Install the PoE Ethernet switch
Install the Wi-Fi access points
Install electricity meters
Install the charging stations
Install heat and water meters
Install the RFID reader
Install the three-phase Relay meter
Install the Shelly relay meter
Install the 4-relay I/O module
Verification and testing
Owner
Administrative setup
Getting started guide - administrative setup
Form - 1. Contact details
Form - 2. Solutions
Form - 3. Billing rates
Contract and documents to be completed
Online account for owners
Information flyers for consumers
Online access, RFID badge and charging stations
FAQ and other information
Resident
Account and app
Electricity invoice
Electric vehicle charging station
Building laundry room
Electric vehicle charging (eBike)
Platform
Platform Access
Terminology
Accounts and contacts
Site
Settings
Creation/editing of a note or an issue to be processed
Close an issue to be processed
Site statuses
Add/Modify the building(s)
The steps for the setup phase of a site
Delete/deactivate a site
Add/Modify equipment
Edit the basic information of a site
Equipment
Add/modify a gateway
Add/modify a router
Add/modify an electricity meter
Bulk insert meters
Bulk assign meters to a gateway
Add/modify a distribution zone
Add/modify a charging station
Add/modify a thermal or water meter
Add/edit a Distribution system operator (DSO) meter (FTP transfer)
Connecting remotely to a Climkit gateway
Administration
Stakeholders
Management terms
View site management conditions
Activation/deactivation of a solution
Configuration of the operating method
Visualize the financial conditions
Creation/edition/addition of a financial condition
Deleting a financial condition
Accounts
Create a consumer account
Create a contact
View and download the invoices of an account
Send Platform Access to a contact
Add/modify the billing address
Link an existing account to a site
Change the correspondence method
Rates and billing points
Creation/editing of a billing point
Record a move (transfer)
Assignment of an account to a billing point
Add/modify the default charge advance payment for a billing point
View the rates of the consumption site
Editing a consumption tariff
Creation/edition of a consumption billing rate
Creation/editing of a consumption tariff component
View fixed rates and subscriptions
Customize invoice line item labels/titles
View the Financial conditions billed to the Billing points
RFID badges
Accounting
Tools
Meter inspection
Visualization
Expense statements
Introduction to the Expense statement generation tool
Create/edit an accounting period for expense statements
Modify the expense statement settings
Add/modify a general expense supplier invoice for an expense statement
Edit the collected advance payments of an expense statement
Particularity of room heating and hot water production fees
Verify and download the meter readings for the expense statements period
Perform the cost allocation and generate the expense statements
Export individual consumption for the expense statement period
API
- Categories
- Installer
- Platform configuration
- Add the router (4G or LAN)
Add the router (4G or LAN)
Updated
by Jean-Nicolas Turlier
This article describes the configuration of a router (4G or LAN) on the Climkit Platform.
For connection planning, or for installing the device on site, refer to the links at the end of the article.
Registering a router (4G or LAN) on the Climkit Platform
All routers delivered by Climkit are preconfigured.
4G Routers are delivered with an active SIM card.
The operation can be performed before or after the installation of the device.
- Log in to app.climkit.io and open the corresponding Site. If necessary, create a new Site.
- Go to
EQUIPMENT > Communication > Routers. Click on the "+" to add a new router. - Enter the
SERIAL(serial number) andLAN MAC(MAC address) numbers of the router in the form, then click Save. The numbers are displayed on the packaging and on the device. It is also possible to obtain them via the QR code.


Cloud Gateway (MQTT) Configuration
When a router is added to a Site, a virtual Cloud Gateway is automatically created in the “Gateways” tab.
If the electricity meters need to be read via the Cloud Gateway, simply add the meters directly to it.
Otherwise, if a Climkit Gateway is planned to be used, refer to the procedure Adding the Climkit Gateway to the platform.