Shelly Relay Meter Installation

Christopher Gautschi Updated by Christopher Gautschi

Each Shelly meter-relay comes with two adhesive labels located on the back of the device.

Steps to follow for each socket equipped with a Shelly:

  1. Peel one of the two labels located on the back of the Shelly.

    Leave the other label on the Shelly, as it is necessary for site identification.

  2. Stick the peeled label on an A4 sheet, clearly specifying:
    • The socket number on which the Shelly is installed.
  3. Take a clear photo of the complete sheet.
  4. Send the photo to Climkit via email to allow remote configuration of the platform.

Example of a filled sheet:

Socket

Label

Socket 1

[label 1]

Socket 2

[label 2]

Important:

  • A mismatch between the labels and the sockets leads to errors in the configuration of the platform.
  • Each Shelly must be clearly identified, the information must be readable in the photo sent.