Install the Shelly relay meter

This article describes the on-site installation of a Shelly I/O module. Configuration on the Climkit platform is also required for the equipment to function. Links are provided at the end of the document.

Installation of a Shelly Relay Meter

  1. Connect the Shelly relay meter to the power supply of the socket to be controlled according to the diagram below.
  2. Each device comes with two adhesive labels located on the back of the device. Peel off one of the two labels from the back of the Shelly and stick it onto an A4 sheet. Do not remove the other label.
  3. Repeat the operation for each relay meter, then take a photo of the A4 sheet with the list and send it to Climkit at service@climkit.io to allow the integration of the devices with the platform.
Each Shelly must be clearly identified; the information must be legible on the photo sent. A mismatch between the labels and the sockets will result in errors in the platform configuration!