Install the Shelly relay meter

Jean-Nicolas Turlier Updated by Jean-Nicolas Turlier

This article describes the on-site installation of a Shelly I/O module. For the equipment to function, a configuration on the Climkit Platform is also required. Links are available at the end of the document.

Installation of a Shelly Relay meter

  1. Connect the Shelly Relay meter to the power supply of the socket to be controlled according to the diagram below.
  2. Each device comes with two self-adhesive labels located on the back of the device. Peel off one of the two labels from the back of the Shelly and stick it on an A4 sheet. Do not remove the other label.
  3. Repeat the operation for each Relay meter, then take a photo of the A4 sheet with the list and send it to Climkit at service@climkit.io to allow the integration of the devices into the platform.
Each Shelly must be clearly identified, and the information must be legible on the photo sent. Incorrect matching between labels and sockets will lead to errors in the platform configuration!