Contractor
Getting started
Solutions and documentation structure
Material ordering and commissioning
General Sales Terms and Conditions and Warranty
Connection diagrams
Gateway et communication
Community - Electricity metering - RCP
Heating - Heating and water metering
Mobility - Charging stations for electric vehicles
Washaccess - Laundry Manager
EBike - Electric bike charging
Optimization of self-consumption
Energy monitoring of the building
Equipment and installation
Gateway Climkit
4G router
LAN router
RS485-Ethernet converter
Switch ethernet DIN POE
WiFi network
Electric meters
MBus-RS485 converter
Heating & Water Meters
EV Charging Stations
I/O module 4 relays 8 DI
RFID Readers
Relay meters
Commissioning
Configuration and commissioning
Getting started guide to commissioning
Add a router to a site
Add a Gateway Climkit to a site
Electric meter configuration
Configuring charging stations
Configuring heating and water meters (MBus)
Optimization via Relays and EV Terminals
Verification of Meter Connections
Advanced Configuration
Configuration Gateway
Cloud Gateway Configuration (MQTT)
RFID Reader Configuration
IP Network Configuration & Routers
RS485-Ethernet TCP/IP converters
Configuring Teltonika RUT241
Configuring Display Screens
Configuring Modbus counters
Processing of Count Data
Meter Read Manually
Inepro PRO380 meters and others
Configuration EV charger Zaptec
Configuration of ABB charging station
Configuration of Schneider EVlink Pro AC charging station
Property Owner
Administrative Setup
Getting Started – Administrative Setup
Form - 1. Contact Details
Form - 2. Solutions
Form - 3. Prices
Contract & Documents to Complete
Online Account for Owners
Information Flyers for Residents
Online Access, RFID Badge & Charging Stations
FAQ & other Information
Resident
Platform
Access to the platform
Site
Parameters
Creation/Editing of a Note or Issue to Address
Close an issue to be addressed
Add/Edit Building(s)
Add/Edit Equipment(s)
Edit Basic Site Information
Administration
Accounts
Create a contact
View and Download Invoices from an Account
Send access to the platform to a contact
Add/Modify Billing Address
Changing the Matching Method
Rates and Billing Points
Creation/editing of a billing point
Registering a move (transfer)
Account Assignment to a Billing Point
Creation/Editing of a Consumption Rate
Add/Modify the Default Charge Deposit of a Billing Point
Creation/Editing of a Consumption Rate Component
Editing a consumption tariff
RFID Badges
Accounting
Tools
Visualization
Expense Reports
Introduction to the Expense Count Tool
Add/Edit a General Expense Invoice from an Expense Statement
Edit the received deposits of an expense statement
Particularities of Heating and Hot Water Production Costs
Check and download meter readings for the billing period.
Distributing and Generating Fee Summaries
Export Individual Consumption for the Expense Reporting Period
API
- Categories
- Platform
- Site
- Tools
- Expense Reports
- Particularities of Heating and Hot Water Production Costs
Particularities of Heating and Hot Water Production Costs
Updated
by Nicolas Vodoz
In an expense statement, heating costs are divided between room heating and the production of domestic hot water. Here’s how to proceed:
- Follow the instructions to Add/modify an expense invoice in an expense statement.
- Insert the invoice for the first time with the type Room Heating.
- Under Note, define the amount related to room heating and the amount related to the production of hot water. See Connecting meters for more information on how to define these two amounts.
- Under Amount, enter the amount for room heating. Complete the other fields and click on save.
- Reopen this invoice and click on the copy icon in the top right (to the left of the trash bin).
- In the new invoice, select the type Hot Water Production and enter the amount for the production of hot water.