Steps for commissioning a site

Nicolas Vodoz Updated by Nicolas Vodoz

  1. Open the site > Site > Overview
  2. In the Commissioning steps window, the five commissioning steps for a site are shown in execution order:
    1. Equipment order: The equipment for the site has been ordered and is being installed by the site installer.
    2. Technical equipment setup: The equipment has been installed and communicates with the platform.
    3. Technical setup validation: The site coordinator has validated that the equipment setup was carried out correctly according to the planning and assembly instructions.
    4. Administrative setup: The administrative setup process with the owner or their proxy is complete.
    5. Billing launch: The statements or consumption invoices for the site's residents have been generated and sent for the first time.
  3. Completed steps are marked with a green checkmark with the date on which they were completed. Once all steps have been completed, the site is considered operational according to the defined management conditions.