Virtual assistant
Installer
Planning
Installer Getting Started Guide (Read first)
Overall site planning Climkit
Climkit site setup process
Planning the Climkit Gateway connection and network connectivity
Planning electricity management
Planning Electric Vehicle Charger Management
Planning heating, water, and ancillary cost management
Planning collective laundry management
Planning charging management for electric bikes
General terms and conditions of sale
Platform configuration
Installer Account Request
Creating a new site
Add the router (4G or LAN)
Adding the Climkit Gateway
Adding electricity meters
Registering photovoltaic installation info
Save the battery information
Adding charging stations
Add OCPP Remote Charging Station
Add the 4-relay I/O module
Adding RFID readers
Adding heat and water meters
Installation and connection
Install the 4G Router
Install the LAN Router
Install the Climkit Gateway
Install the RS485-Ethernet converter
Install the M-Bus converter
Install the standard Ethernet switch
Install the PoE Ethernet switch
Install Wi-Fi access points
Installing electricity meters
Installing charging stations
Install heat and water meters
Install the RFID badge reader
Install the three-phase relay meter
Install the Shelly relay meter
Install the 4-relay I/O module
Verification and testing
Owner
Administrative setup
Getting started guide - administrative setup
Form - 1. Contact details
Form - 2. Solutions
Form - 3. Rates
Contract and documents to complete
Online account for owners
Information flyers for consumers
Online access, RFID badge and charging stations
FAQ and other information
Resident
Account and app
Electricity bill
Car charging station
Building laundry room
Electric vehicle (eBike) charging
Platform
Platform Access
Terminology
Site
Parameters
Creation/editing of a note or issue to be processed
Close an open issue
Site statuses
Add/Modify Building(s)
The steps for setting up a site
Delete/deactivate a site
Add/Edit Equipment
Modify site basic information
Equipment
Add/modify a gateway
Add/modify a router
Add/modify an electricity meter
Bulk meter insertion
Bulk assigning meters to a gateway
Add/modify a distribution zone
Add/modify a charging station
Add/modify a thermal or water meter
Add/edit a DSO meter (FTP transfer)
Remote connection to a Climkit gateway
Administration
Stakeholders
Management conditions
View site management conditions
Activating/deactivating a solution
Operating method configuration
Viewing financial conditions
Creation/editing/adding a financial condition
Cancellation of a financial condition
Accounts
Create a consumer account
Create a contact
View and download invoices for an account
Send platform access to a contact
Add/modify billing address
Link an existing account to a site
Change the matching method
Rates and billing points
Creation/editing of a billing point
Registering a move (transfer)
Assigning an account to a billing point
Add/modify default charge advance payment for a billing point
View consumption site rates
Consumption rate edition
Creation/editing of a consumption rate
Creation/editing of a consumption tariff component
View fixed rates and subscriptions
Customize invoice position labels
View Financial conditions invoiced at billing points
RFID badge
Accounting
Tools
Meter control
Visualization
Expense statements
Introduction to the Expense Statements Tool
Create/modify a cost accounting period
Modify expense statement settings
Add/modify a general expense invoice for an expense statement
Edit collected advance payments for an expense statement
Specifics of heating and hot water production fees
Check and download meter readings for the cost accounting period
Allocate costs and generate expense statements
Exporting individual consumption for the billing period
API
Table of Contents
- Categories
- Installer
- Installation and connection
- Install the Climkit Gateway
Install the Climkit Gateway
This article describes the on-site installation of the Gateway. For the equipment to function, configuration on the Climkit platform is also required. Links are available at the end of the document.
Climkit Gateway Installation
- Connect the 24V AC/DC power supply electrical cable to the + and - ports of the device.
- Connect the RS485 bus of the Modbus meters to the A, B, and SG (for GND) ports of the device.
- Connect the Ethernet/RJ45 port (LAN) to the router.

- The device starts up in a few minutes, and 4 LEDs on the front panel indicate the Gateway status:
- "Lightning bolt" lit blue: The Gateway is correctly powered. It flashes during startup.
- Orange "Globe" indicates the connection status:
- fast flashing: The Gateway has started correctly but is not configured. It must be added to a site so that it can download its configuration, including the list of meters to be read on the site.
- slow flashing: The Gateway has started correctly but is not connected to the Internet. Check the connection to the router.
- continuously lit: The Gateway has started, is configured, and is connected to the Internet.
- "Tx" flashes: The Gateway is sending a read command to a device, such as an electricity meter, connected to the RS485 bus.
- "Rx" flashes: The Gateway is receiving the requested information from the device. When the Gateway successfully reads a meter, Tx and Rx flash almost simultaneously.
PHOTO: https://drive.google.com/file/d/1BVDgV2CHmMDxrGLXa8WVsXk0LHKgKjBR/view?usp=sharing
Climkit Gateway Firewall Network Requirements
If the Climkit Gateway is connected to a third-party computer network, the following endpoints and ports must be configured.
Destination | Port | Protocol |
*.climkit.io | 80, 443 | HTTP, HTTPS |
*.climkit.link | 80, 443 | HTTP, HTTPS |
*.climkit.link | 22 (outgoing) | SSH |
*.pool.ntp.org | 123 | NTP (UDP) |