Virtual Assistant
Installer
Getting Started Guide
Solutions and Documentation Structure
Material ordering and commissioning
General Sales Terms and Conditions and Warranty
Connection Schemes
Gateway and Communication
Community - Electric Metering - RCP
Heating - Heating and Water Metering
Mobility - EV Charging Stations
Washaccess - Laundry Manager
EBike - Charging Electric Bicycles
Optimization of self-consumption
Energy monitoring of the building
Equipment and Installation
Gateway Climkit
4G Router
LAN Router
RS485-Ethernet Converter
Switch ethernet DIN POE
WiFi Network
Electric Meters
MBus-RS485 converter
Heating & Water Meters
EV Charging Stations
Relay I/O Module
RFID Readers
Relay Meters
Storage system (battery)
Configuration and commissioning
Commissioning
Start-Up Guide for Commissioning
Add a router to a site
Add a Climkit Gateway to a Site
Configuration of Electric Meters
Charging Station Configuration
Configuration of heating and water meters (MBus)
Optimization via Relay and EV Charging Stations
Verification of Meter Connections
Advanced Configuration
Gateway Configuration
RFID Reader and Meter-Relay Configuration
IP network configuration and routers
RS485 to Ethernet TCP/IP Converters
Configure Teltonika RUT241
Configuring Display Screens
Modbus Meter Configuration
Data Counting Processing
Meter Read Manually
Inepro PRO380 Meters and Various
Configuration of ABB charging station
Wallbox Configuration
Firewall Rules for Climkit Gateway
Configuration of Schneider EVlink Pro AC charging station
Zaptec Terminal Configuration
Owner
Administrative setup
Getting Started Guide - Administrative Setup
Form - 1. Contact Details
Form - 2. Solutions
Form - 3. Rates
Contract and documents to complete
Online Account for Homeowners
Information Flyers for Consumers
Online access, RFID badge, and charging stations
FAQ and Other Information
Resident
Platform
Access to the platform
Terminology
Site
Parameters
Creation/Editing of a Note or an Issue to be Addressed
Close an issue to be addressed
The states of a site
Add/Edit Building(s)
The steps to set up a website
Remove/Disable a Site
Add/Edit Equipment(s)
Edit Basic Site Information
Equipment
Add/Modify a Gateway
Add/Edit a Router
Add/Modify an Electricity Meter
Mass Insertion of Meters
Bulk Assign Counter to a Gateway
Add/modify a distribution area
Add/Modify a Charging Station
Add/Modify a Thermal or Water Meter
Add/Edit a DSO Meter (FTP Transfer)
Connecting Remotely to a Climkit Gateway
Administration
Speakers
Management Conditions
Visualizing Site Management Conditions
Activation/Deactivation of a Solution
Configuration of the Operating Method
Visualizing Financial Conditions
Creation/Editing/Adding a Financial Condition
Removal of a financial condition
Accounts
Create a Consumer Account
Create a contact
View and Download Invoices from an Account
Send platform access to a contact
Add/modify billing address
Link an Existing Account to a Site
Change the Matching Method
Rates and Billing Points
Creation/Editing of a Billing Point
Registering a Move (Transfer)
Account allocation to a billing point
Add/modify the default charge deposit of a billing point
See the prices on the consumption site
Editing a consumption rate
Creation/Editing of a Consumption Rate
Creation/Editing of a Consumption Rate Component
See Fixed Rates and Subscriptions
Customize Invoice Line Item Labels/Titles
See the Financial Conditions Invoiced at the Billing Points
RFID Badges
Accounting
Tools
Meter Control
Visualization
Expense Reports
Introduction to the Expense Tracking Tool
Create/modify a fee countdown period
Modify Fee Count Settings
Add/Modify a General Expense Invoice in an Expense Report
Edit the deposits received from an expense statement
Specificity of heating and hot water production costs
Check and download meter readings for the billing period
Distributing and Generating Expense Summaries
Exporting Individual Consumption for the Expense Settlement Period
API
Other processes
- Categories
- Other processes
-
- Semi-annual Inventory
Semi-annual Inventory
Each semester a complete inventory must be conducted to update stock levels and recalculate the average purchase price of each product.
The inventory is carried out on July 31 and December 31.
Inventory Preparation (2-3 weeks prior)
- Contact ASTH to agree on a date for the physical onsite inventory.
- Prepare the file for the relevant semester and the working document by referencing a previous one on the Drive.
- Pre-export the stock from Bexio and start calculating "total value of goods" and "Average Purchase Value". Retrieve the latest deliveries/invoices corresponding to the balance of products still in stock and perform the following calculation: [Quantity in stock * product price * exchange rate]
- The product price can be found on old invoices, either by searching through supplier invoices, orders, the journal, or Notion.
- The exchange rate can be found in Bexio in the journal on the day the invoice was paid.
Inventory Day
- Export Bexio on the morning of the inventory at 07:00: from product stock and product movement.
- Update quantities in the inventory file according to the Bexio extract.
- Send the document to ASTH for them to conduct the physical inventory.
- Request someone from the office to inventory the moving stocks (Car, office, Cablex).
- Upon receiving the numbers from ASTH,
- Re-export Bexio at 16:00: from product stock and product movement.
- Update the day's movements in the global inventory file.
- Recalculate the total value of goods, as the number of items in stock has changed.