Virtual Assistant
Installer
Getting Started Guide
Solutions and structure of the documentation
Hardware Ordering and Commissioning
General Terms of Sale and Warranty
PP - Installer Guide - from Planning to Commissioning
PP - Presentation of Climkit Solutions
PP - Information to be collected on site
PP - Procedure for Requesting a Quote
PP - Offer Content
Connection Schemes
Gateway and Communication
Community - Electrical Metering - RCP
Heating - Heating and Water Metering
Mobility - EV Charging Stations
Washaccess - Laundry Manager
eBike - Recharge Electric Bikes
Optimization of Self-consumption
Energy monitoring of the building
Equipment and Installation
Configuration and commissioning
Commissioning
Startup Guide for Commissioning
Add a router to a site
Add a Climkit Gateway to a site
Configuration of Electric Meters
Charging Station Configuration
Configuration of Heating and Water Meters (MBus)
Installation of Shelly Relay Meters
Optimization via Relay and EV Charging Stations
Verification of Meter Connections
Advanced Configuration
Gateway Configuration
RFID Reader and Meter-Relay Configuration
IP Network Configuration and Routers
RS485 to Ethernet TCP/IP Converters
Configuring Teltonika RUT241
Display Screen Configuration
Configuration of Modbus Meters
Data Counting Processing
Manually Read Meter
Inepro PRO380 Meters and Various
ABB Terra AC Charger Configuration
Wallbox Setup
Firewall Rules for Climkit Gateway
Schneider EVlink Pro AC Charger Configuration
Zaptec Terminal Configuration
Owner
Administrative setup
Getting Started Guide - Administrative Setup
Form - 1. Contact Details
Form - 2. Solutions
Form - 3. Rates
Contract and documents to complete
Online Account for Owners
Information flyers for consumers
Online access, RFID badge, and charging stations
FAQ and Other Information
Resident
Account and app
Electricity bill
Car charging station
Laundry room of the building
Electric Bike (eBike) Charging
Platform
Access to the platform
Terminology
Site
Parameters
Creation/Editing of a Note or an Issue to Address
Close an issue to be addressed
The statuses of a site
Add/Edit Building(s)
The steps to set up a site
Delete/Disable a Site
Add/Edit Equipment
Edit Basic Site Information
Equipment
Add/modify a gateway
Add/Modify a Router
Add/Edit an electricity meter
Insert Meters in Bulk
Assign meters in bulk to a gateway
Add/Modify a Distribution Area
Add/Modify a Charging Station
Add/modify a thermal or water meter
Add/Edit a DSO Meter (FTP Transfer)
Connecting Remotely to a Climkit Gateway
Administration
Speakers
Management Conditions
Visualizing Site Management Conditions
Activation/Deactivation of a Solution
Configuration of the Operating Method
Visualizing the financial conditions
Creation/Editing/Adding a Financial Condition
Removal of a financial condition
Accounts
Create a consumer account
Create a Contact
View and Download Invoices for an Account
Send the access to the platform to a contact
Add/Modify Billing Address
Link an existing account to a site
Change the correspondence method
Rates and Billing Points
Creation/Editing of a Billing Point
Registering a move (transfer)
Assignment of an account to a billing point
Add/Modify the Default Charge Advance Payment of a Billing Point
See the consumption site rates
Editing a consumption rate
Creation/Editing of a consumption rate
Creation/Editing of a Consumption Rate Component
View Fixed Rates and Subscriptions
Customize Invoice Line Item Labels/Headers
See the Financial conditions billed at the billing points
RFID Badges
Accounting
Tools
Meter Control
Visualization
Expense Reports
Introduction to the Fee Count Tool
Create/Modify an Expense Accounting Period
Modify the Fee Deduction Settings
Add/modify an overhead invoice from an expense statement
Edit the advance payments received from an expense statement
Specifics of heating costs and hot water production
Check and download meter readings for the billing period
Distributing and Generating Fee Statements
Export individual consumption for the billing period
API
- Categories
- Installer
- Getting Started Guide
- PP - Information to be collected on site
PP - Information to be collected on site
Updated
by Christopher Gautschi
Information to be collected on-site
Before placing an order for hardware, here are the questions to consider.
This ensures that the need is well understood and accurately reflected in the offer.
- Number and type of meters (direct or indirect if >80A) + intensity if indirect meter?
- Number of meter plates for mounting on T-plate if necessary?
- Available internet connection on-site or is it necessary to plan for a 4G connection?
- If 4G connection, check for good signal reception (network) and if necessary plan for an extension and/or an external antenna.
- Charging station for electric vehicles? If yes, how many?
- Laundry manager? If yes, how many washing columns?
- Manager for electric bike charging? If yes, how many controllable sockets?